Deutschland – Bauarbeiten für Stahlkonstruktionen – B62 TB Rinsenau, Herstellung DB Schutzgerüst

Open Contract notice Deadline passed Save

Summary

Machine-generated summary

This tender procures the construction of a protective steel scaffold beneath the Rinsenau valley bridge on the DB railway line 2880 (Siegen–Betzdorf). The buyer is Deutsche Bahn (DB). The scaffold, measuring roughly 50 m long, 16 m wide, and 9.5 m high, will rest on micropiles and shield the electrified tracks during future bridge replacement works. Notably, the actual replacement of the bridge is excluded from this contract. Installation must occur during a track closure from 13 December 2026 to 3 May 2027. No estimated value, bidding eligibility, or procedure type is specified in the provided information.

Description

Die bestehende Straßenbrücke TB Rinsenau muss durch einen Ersatzneubau ersetzt werden. Die Leistungen zum Ersatzneubau der TB Rinsenau sind aber nicht Bestandteil dieser Ausschreibung. Vorlaufend zum vorgenannten Bauvorhaben, muss unterhalb der Talbrücke Rinsenau ein Schutzge-rüst, für die elektrifizierte zweigleisige DB Bahnstrecke 2880 "Siegen - Betzdorf" errichtet werden. Dieses DB Schutzgerüst wird aus robusten Stahlträgern errichtet und ist ca. 50 m lang, ca. 16 m breit und ca. 9,5 m hoch und ist Hauptgegenstand dieser Ausschreibung. Die Errichtung des Schutzgerüstes muss in einer DB Sperrpause vom 13.12.2026 bis 03.05.2027 durchgeführt werden. Durch das DB Schutzgerüst sollen spätere Arbeiten an der TB Rinsenau, unter laufendem DB Fahr-betrieb gewährleistet werden, sodass für den Ersatzneubau der TB Rinsenau, keine weiteren DB Sperrpausen benötigt werden. Gegründet wird die Stahlkonstruktion mittels Mikropfählen.

Official source

Source: TED — Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

View the official notice

Similar tenders