Aller au contenu
Licitop.eu

Ireland – Construction work – No. 6 Harcourt Street - Conradh na Gaeilge - Phase 3B - Construction of extension shell and core

Ouvert Avis de marché Aucune date limite publiée

Description

Phase 3b: Shell and Core Construction of a New Four-Storey over Two-Storey Basement Structure: Works include the construction of a new weather tight four-storey over two storey basement rear extension (716 m²) to the Protected Structure including lift and stair cores, external finishes, glazing, primary and secondary steel and masonry works. The protected structure and new extension will be linked by an atrium space with glazed roof and connecting walkways, which will be constructed as part of this phase. Restoration works will also be carried out to the basement walls and floor of the Protected Structure including a new floor slab, drainage and waterproofing detailing with continuity into the extension. M and E service installations will not be included in this phase.

Source officielle

Source : TED — Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Consulter l'avis officiel

Marchés similaires