Przejdź do treści
Licitop.eu

Ireland – Lock gates – New Lock gates for Phase 3 Ulster Canal

Zamknięty Ogłoszenie o zamówieniu

Opis

This tender is for the design , manufacture and supply of 2 pairs of timber lock gates for the lock chamber at Gortnacarrow on the Ulster Canal. The gates are to be manufactured using ekki timber. Contract to include the supply and installation of flow control sluices on the gates, and the steel walkways to the gates. The gates will be designed to be hydraulically operated and all connections to rams/ supports to be designed and supplied by the gate manufacturer. Professional advice and supervision is to be included for during the gates installation.

Oficjalne źródło

Źródło: TED — Tenders Electronic Daily (Publications Office of the EU)

Zawsze weryfikuj szczegóły w oficjalnym ogłoszeniu.

Zobacz oficjalne ogłoszenie

Podobne przetargi