Przejdź do treści
Licitop.eu

Ireland – Electrical installation work – CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Udzielony Ogłoszenie o udzieleniu zamówienia Nie opublikowano terminu Zapisz

Opis

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Oficjalne źródło

Źródło: TED - Tenders Electronic Daily (Publications Office of the EU)

Zawsze weryfikuj szczegóły w oficjalnym ogłoszeniu.

Zobacz oficjalne ogłoszenie

Podobne przetargi