Vai al contenuto
Licitop.eu

Ireland – Meters – P20899 Supply, install, commissioning, integration of Utility Meters for Dublin and Cork airport

Aperta Bando di gara Nessuna scadenza pubblicata Salva

Descrizione

daa is upgrading some of its electrical, thermal and water metering infrastructure across the Dublin Airport campus. The project covers the supply, installation, commissioning, integration of a new generation of utility meters, replacing legacy devices that no longer meet daa’s operational, accuracy or datamanagement requirements. The upgraded meters will provide highaccuracy, MIDcompliant measurement, enhanced data and realtime visibility of energy usage. The programme includes the deployment of new meters, communication interfaces, telemetry solutions for remote locations and full integration with Dublin airport’s existing Energy Management Systems. The solution must be open protocol and technology - agnostic. The project will also consider futureproofing options, including compatibility with LoRaWAN and other IoTbased technologies.

Fonte ufficiale

Fonte: TED — Tenders Electronic Daily (Publications Office of the EU)

Verifica sempre i dettagli nell'avviso ufficiale.

Vedi l'avviso ufficiale

Gare simili