Saltar al contenido
Licitop.eu

Norway – Pipeline, piping, pipes, casing, tubing and related items – BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).

Abierta Anuncio de licitación Sin fecha límite publicada Guardar

Descripción

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Fuente oficial

Fuente: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica siempre los detalles en el anuncio oficial.

Ver el anuncio oficial

Más de este comprador

Perfil completo del comprador

6 licitaciones abiertas ahora mismo

Adjudicaciones recientes

Licitaciones similares

No te pierdas ninguna licitación como esta

Recibe un email con las nuevas licitaciones de: Materiales de construcción · Noruega. Gratis.

Crear mi alerta