Saltar al contenido
Licitop.eu

Iceland – Construction work for tunnels – Sultartangi Power Station - Enlargement of the headrace tunnel cross-section

Cerrada Anuncio de licitación Guardar

Descripción

It is proposed to carry out an enlargement of the headrace tunnel cross-section at the Sultartangi Power Station. The project area is located at an elevation of approximately 260–280 m a.s.l., within a designated industrial area. The headrace tunnel is approximately 3.4 km in length. The existing tunnel has an elliptical cross­section with an approximate area of 152 m². The proposed enlargement involves lowering the tunnel invert by 4.5 m below the existing level. The estimated excavation volume is approximately 124,000 m³ measured in solid rock (in situ).

Fuente oficial

Fuente: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica siempre los detalles en el anuncio oficial.

Ver el anuncio oficial

Más de este comprador

Perfil completo del comprador

2 licitaciones abiertas ahora mismo

Adjudicaciones recientes

Licitaciones similares

No te pierdas ninguna licitación como esta

Recibe un email con las nuevas licitaciones de: Trabajos de construcción · Islandia. Gratis.

Crear mi alerta