Saltar al contenido
Licitop.eu

FW Supply and Install - Primary Transformers - Multi Site 0338

Abierta Anuncio de licitación Sin fecha límite publicada Guardar

Descripción

Scottish Hydro Electric Power Distribution plc and Southern Electric Power Distribution plc (SSEN) intends to establish a multi-supplier Framework Agreement for the supply, delivery to site, off-loading onto prepared foundations, installation, preparation for service and commissioning of medium power oil immersed three-phase double-wound primary transformers. The transformers will operate at primary voltages of 33kV, 22kV and 11kV, with power ratings ranging from approximately 1.5MVA to 20/40MVA. Each transformer shall be designed to operate as part of a parallel supply scheme and be capable of carrying full rated load continuously in the event of the loss of a partner transformer. Transformers shall also be capable of operating under reverse power flow conditions. The scope includes all associated equipment required to provide a fully operational installation, including, but not limited to: Cooling systems Tap changers Control and monitoring equipment Transformer protection interfaces Initial oil fill Installation and commissioning services As part of the procurement, SSEN intends to adopt a standardised and modular transformer design philosophy to support a "design once, build many" approach. The objective is to reduce design variation, improve manufacturing efficiency, enhance security of supply and support long-term network investment requirements.

Fuente oficial

Fuente: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Verifica siempre los detalles en el anuncio oficial.

Ver el anuncio oficial

Licitaciones similares

Quedan 23 días Maquinaria eléctrica Reino Unido

Theatre UPS Replacements

Northumbria Healthcare Facilities Management

18.776 €

valor est.

No te pierdas ninguna licitación como esta

Recibe un email con las nuevas licitaciones de: Maquinaria eléctrica · Reino Unido. Gratis.

Crear mi alerta